7. Practical R.C.C column

 Aim:- To Prepare R.C.C Column.

Requirement :-Tools and equipment measuring tape, thapi,                                 khore, gunny bags,etc

Materials :-8mm torshan bar, 6 mm bar, sand, gravels, cement, water, etc

Procedure  :- 1) Take torshan bar 8 mm and 6 mm bar  make frame and ring
  2) Mix cement, gravels, sand,concrete
 3)Take molde and fix torshan bar and fill with concrete
4) use G.I wire to roped it a molde. Costing of materials:-



Sr.no
MATERIALS
QTY
RATE
AMOUNT
1
SAND
4  TOPLI
15 PER
60
2
GRAVELS
2  TOPLI
12 PER
24
3
CEMENT
2  TOPLI
8 PER
112
4
TORSHAN BAR    8 MM
1.93 kg
48 KG
92.68
5
TORSHAN BAR    6 MM
0.222kg
48 K
92.68



WORKING CHARGE 25%
95.34





TOTAL
476.70